Fabrication – Boilermaker/Plater/Welder
Duration
- On average 27 Months
- 10 Months institutional training
- 15 Months on-the-job
- 02 Months trade test preparation and Trade test
Entry Requirements
All requirements for learners and the following:
- Minimum of Grade 12 Maths and Science or Technical N2 Maths and Engineering Science (Minimum of 40% )
- Candidate will require a full N2 (four subjects) to Qualify for a test
Basic Phase
- Electrical Trade Theory
- Engineering Science
- Mathematics
- Industrial Electronics
- Wire an auto transformer starter
- Balance loads
- Construct and test regulated power supply
- Test thyristor
- Test thyristor phase control
- Explain and apply PLC operating principles
- Identify and use capacitors
- Identify and use inductors
- Identify and use diodes
- Construct rectification circuits
- Identify and use zener diodes
- Construct a voltage doubler
- Identify transistor action
- Identify transistor configurations
- Examine bearings
- Mount a bearing manually
- Remove and mount a bearing mechanically
- Remove and mount bearings
- Fit a 16 amp plug top
- Fit a compression gland
- Fit a gland
- Join a cable
- Connect a three phase squirrel cage motor
- Determine the condition of DC circuit breakers
- Select conductors and cables
- Check a commutator for wear
- Course control documents
- Connect up cable ends
- Connect and earth equipment
- Change electrical motors
- Explain induction motors (a) Squirrel cage (b) Slip Ring
- Identify contactors
- Secure cables to catenary wire, poles and trays
- Connect a three phase slip-ring motor
- Test a low voltage cable
- Check and test an AC induction motor
- Check and test a DC motor
- Change transformer oil (LV)
- Construct and wire a conduit panel
- Wire a panel
- Do a tap change on a transformer (LV)
- Determine the condition of battery connections
- Connect a load to DC generator
- Connect a DC motor and starter
- Connect a Ward-Leonard speed control
- Direct current machines: theory
- Maintain and align couplings
- Carry out daily maintenance checks on a transformer (LV)
- Wire a direct-on-line starters
- Disassemble and overhaul grids
- Read engineering drawings
- Do an insulation resistance and continuity test on an installation
- Use an electrical blower
- Wire circuits
- Explain and draw single phase earth leakage protection circuits
- Connect a single phase energy meter
- Connect three phase energy meters
- Connect three phase energy meters with range extension
- Explain the use of electrical measuring instruments
- Read energy meters
- Analyse electrical units
- Fit lugs to cable core
- Do fault find on electrical circuits
- Fault find electronic circuits one
- Fault find basic electrical circuit
- Fault find live electrical circuit
- Fault find and repair geysers
- Fault find and repair kettles
- Fault find and repair electric iron
- Fault find and repair polishers
- Fault find and repair stoves
- Fault find and repair urns
- Fit a gland to a PVC cable
- Test, maintain and repair 6,6KV drive
- Use and maintain a variety of hand tools
- Operate and maintain a pedestal drill
- Solder components
- Heat shrink joint on PVC/SWA cable
- Heat shrink joint on PILC/SWA cable
- Maintain HT and LT switch gear
- Install bus-bars in a distribution box